TWINGS
TWINGS - Three Channel AI Dashcam (4G)
TWINGS - Three Channel AI Dashcam (4G)
Couldn't load pickup availability
Share
Key Features
Real-Time GPS Tracking
Live vehicle location with high accuracy
Built-in GSM & GPS
Stable connectivity and precise tracking
Remote Engine ON/OFF (Optional)
Control engine remotely via app( Order Relay Extra cost)
Built-in Backup Battery
Tracking continues during power cut for short duration
Multiple Alerts
Ignition, over-speed, Idle, Parling, power cut & many more…
Geo-Fence Alerts
IN/OUT notifications for defined zones
Vehicle Document Management
Store and manage RC, insurance, PUC & permit documents digitally
Analytics & Reports
Trip, distance, speed & stoppage reports
Multi-User Access
Share live tracking with multiple users
Safe Parking Mode
Alert on unauthorized vehicle movement Via Syrian in APP.
App Voice Notifications
Real-time voice alerts for Android app only
Device Disconnect Alert
Notification if device is unplugged
Route History & Playback
View past trips and movement history for 90 days.
Smart GPS Tracking. Complete Vehicle Control
Real-time tracking, alerts, reports & theft protection from day one.
AI 4G Dashcam with Live Video & Cloud Storage
See what’s happening inside and outside your vehicle anytime, anywhere.
Voice AI Alerts That Warn Drivers Instantly
In-cabin voice warnings with automatic video & snapshot capture.
Instant Incident Proof on Owner’s App
AI events trigger real-time video & image alerts stored securely in cloud.
Theft Protection Beyond Parking Mode
Direct call alert to owner even when Safe Parking is disabled.
No Hidden Charges. Active from Installation Day.
All features included — no surprise unlocks or paid add-ons later.
Made-in-India Software with Indian Servers
Faster access, better data compliance & dedicated local support.
One Platform. GPS + Video + Documents.
Tracking, dashcam footage & vehicle documents managed in a single app.
Built for Personal, Fleet & School Vehicles
Scalable solution for individual owners, businesses & institutions.
Remote Video Playback
View AI-triggered and normal recordings anytime
SD Card Support
Flexible local storage options
GPS–Video Synchronization
Video events linked with exact location & trip data
Voice monitoring
Can hear what inside the cabin of vehicle.
DMS + ADAS: Built for Safer Driving
DMS (Driver Monitoring System) – Detects drowsiness, distraction, phone usage & fatigue amny more.
ADAS (Advanced Driver Assistance System) – Lane departure, forward collision & close following alerts, Pedestrian warning.
Third Camera in rear monitoring and recorded.
Add-ons
Software
Package Includes
- 3 Ch AI 4G Dashcam
SD card for the dashcam is customer’s scope.
Mode Of Installation
Cost

Frequently Asked Questions
How do I set up and activate the device?
Installation and activation instructions are provided in the manual included with the device.
How can I get assistance if I need help?
Our dedicated support team is available to assist you through call, email, WhatsApp, or directly via our app's custom support feature. Contact 9688022228.
Does this product come with a warranty?
Our TWINGS device is protected by a comprehensive 1-year replacement policy. Any product issues due to manufacturing defects will be resolved with a free replacement.
What happens when my subscription expires?
You can renew your plan anytime in our mobile app or web application.
What subscription plans are available?
You can choose a subscription that fits your needs — 1 month or 1, 2, 3, or 5 years.
What’s the return policy?
Try Our TWINGS device worry-free for 10 days. If you're not completely satisfied, return it within 10 days for a full refund, hassle-free.

